Reformas de cocinas en Valencia
House renovation

Time-frame : 16 weeks

  • General demolition: bathrooms, kitchen, general partitioning, wall and floor coverings, and windows
  • Creation of a new distribution with brick partitioning
  • Insulating layering in party walls
  • Renovation of the plumbing and electricity networks
  • Installation of ducted air conditioning machine
  • Tile tiles and ceramic flooring in the bathrooms
  • Laminate floor in the rest of the house
  • General painting
  • Bathroom equipment installation: built-in shower, bathtub, toilets, sinks and taps
  • New open kitchen
  • General lighting
  • Final cleaning of work
House renovation

Time-frame : 16 weeks

  • General demolition: bathrooms, kitchen, partitions, wall, floor and window coverings
  • Plumbing and electricity networks’ renovation
  • Floor leveling and roughness removing of the gotelé on the walls and ceiling
  • Tile tiles in the bathrooms, porcelain stoneware flooring with wood effect and general painting
  • Bathroom equipment installation: shower, toilets, sinks and taps
  • New kitchen with oven and gas hob
  • Opening of the inner courtyard
  • Facade smoothing, and new pavement on the terrace
  • Installation of guillotine windows with frames
  • Pool renovation: creation of stairs, crack repair,
  • and creation of outdoor terrace
  • Barbecue renovation
  • End of works cleaning
mobiliaria para reforma de cocina
Terrace renovation

Time-frame : 3 weeks

  • Demolition of the floor covering
  • Repair of waterproofing
  • Leveling the soil
  • Installation of non-slip porcelain flooring
  • Sand texture facade cladding
  • Installation of awning
  • Installation of security bars
  • Final cleaning of work
Bathroom renovation

Time-frame : 4 weeks

  • Demolition of the wall and floor covering
  • Removal of bathtub, toilet, bidet and washbasin unit
  • Renewal of the plumbing network and modification of the electrical network
  • Leveling of floor
  • Installing the new tile
  • Installation of porcelain stoneware flooring imitation wood
  • Installation of a toilet, a bidet, a shower tray with screen and taps, and a double sink with its furniture
  • Custom shelving creation in solid wood
  • End of works cleaning
pavimentos para la reforma de una cocina
Appartement renovation

Time-frame : 12 weeks

  • General demolition: bathrooms, kitchen, partitions, wall, floor and window coverings
  • Renovation of the plumbing networks
  • Interior facade insulation
  • Installation of air conditioning embedded in the false ceiling
  • Kitchen space division to create a bathroom with bathtub
  • Tile tiles in the bathrooms, porcelain stoneware flooring with wood effect and general painting
  • Installation of bathroom equipment: shower, bathtub, toilets, sinks and taps
  • New kitchen installation open in the living room
  • Climalit PVC window installation
  • General change of doors
  • Final cleaning of work
House renovation

Time-frame : 12 weeks

  • General demolition: bathrooms, kitchen, partitions, wall, floor and window coverings
  • Plumbing and electricity networks’ renovation
  • Floor leveling and roughness removing of the gotelé on the walls and ceiling
  • Tile tiles in the bathrooms, porcelain stoneware flooring with wood effect and general painting
  • Bathroom equipment installation: shower, toilets, sinks and taps
  • New kitchen
  • End of works cleaning
Bathroom and kitchen renovation

Time-frame : 2 weeks (bathroom) + 3 weeks (kitchen)

  • Demolition of the wall and floor covering
  • Plumbing and electricity networks’ renovation
  • Leveling of floor
  • Bathroom equipment installation: shower, toilets, sinks and taps
  • New open kitchen 
  • End of works cleaning
Bathroom renovation

Time-frame : 2 weeks

  • Demolition of the wall and floor covering
  • Removal of bathtub, toilet, bidet and washbasin unit
  • Renewal of the plumbing network and modification of the electrical network
  • Leveling of floor
  • Installing the new tile
  • Installation of porcelain stoneware flooring
  • Installation of a toilet, a shower tray with screen and taps, and a simple sink with its furniture
  • End of works cleaning
Architectural project
  • Permit Management
  • Current plan
  • Plan for full renovation
  • Plumbing and electrical networks
  • Finishing touches
  • Choice of materials
  • Choice of furnishings
  • 3D model
Transforming a kitchen into a bathroom

Time-frame : 4 weeks

  • Demolition of existing walls between the kitchen and master bedroom
  • Taking down kitchen cabinets and removal of wall and floor tiles as well as false ceiling
  • Levelling of floor
  • Commissioning new plumbing and electrical systems
  • Tiling of walls
  • Polishes cement slab flooring
  • Installation of a toilet, bath and shower and double vanity unit
  • End of works cleaning
reforma integral de cocina en valencia
Transforming a bathroom into a kitchen

Time-frame : 8 weeks

  • Demolition of walls between existing living-room and bathroom
  • Removal of existing elements, wall and floor tiles as well as false ceiling
  • Levelling of floor
  • Commissioning new plumbing and electrical systems
  • Tiling of walls
  • Laying of high resistance engineered wood flooring with damp-proof and sound reducing underlay
  • Installation of white goods
  • Painting
  • End of works cleaning